page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88 page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
86 CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
Although a steep slope minimises the penstock length, it will
be difficult to manually lay the penstock, construct support
piers and anchor blocks if the slope is greater than 1:1. There-
fore, for penstock alignments on slopes steeper than 1:1, the
added site installation cost may outweigh the savings made
on the pipe costs.
Avoid a penstock profile that starts at a gentle slope and then
becomes steeper, because of the risks of negative surge
pressures causing sub-atmospheric pressure. See Section 6.5.
For micro-hydro schemes with less than 20 kW of installed
capacity, the ground profile of the penstock alignment can be
measured using an Abney Level as discussed in Micro-hydro
Design Manual (Ref. 1). For larger micro-hydro schemes, the
use of a theodolite and a professional surveyor is recom-
mended. This is because if the prefabricated bends do not fit
at site due to survey errors, additional cost and time will be
required to amend these, especially if the site is located far
from the roadhead and the pipes are flanged. Note that some
slight adjustment can be made if the pipes are welded at site.
Errors in the design head calculation (due to survey errors)
will result in either oversizing or undersizing the electro-
Photo 6.3 Excavation to reduce the cost of the penstock and reduce
the need for anchors (Siklis)
Photo 6.4 penstock installation is often challenging and
requires safe and careful work.
mechanical units, which will also increase the project cost,
either in terms of lost power production or in extra cost for the
oversized units.
Minimum number of bends
Bends increase the headless and require additional anchor
blocks. Therefore the selected alignment should be as straight
as possible, both in plan and elevation. Note that small bends
can be avoided by varying the support pier heights for the
exposed section and the trench depth for the buried section.
Space for powerhouse area
The chosen alignment should be such that it is possible to
construct a powerhouse at the end of the penstock. A river
terrace well above the flood level is ideal for the powerhouse
area. A route that is otherwise suitable for the penstock
alignment but does not allow for the construction of the
powerhouse is inappropriate.
Stability
Since the penstock alignment is on steep ground slopes and
the pipe is under pressure, it is important for the alignment to
be on stable ground. Any ground movement can damage the